Estimation of Open Cut Mining Recovery and Mining Dilution ...

Estimation of Open Cut Mining Recovery and Mining Dilution By Kent Bannister, ARMIT, FAusIMM (CP), CEO Kent Bannister Pty Ltd, (KBPL) Summary Loss and dilution of Mineral Resource grade occurs during mining activities. Mining Recovery and Mining Dilution estimates are a required consideration in the reporting of Ore Reserves for mineral projects.

Get Price

recovery factor |

recovery factor 1. Measure of extraction efficiency. 2. In mining, the percentage of metal derived from an ore, or coal from a coal seam, etc. 3. In petroleum geology, the percentage of the in situ oil that is recoverable. Between 20% and 40% is common for primary recovery techniques, but enhanced recovery by use of water injection, detergents to reduce viscosity, etc., may increase the ...

Get Price

1 Froth Flotation – Fundamental Principles

these factors into account in froth flotation operations. Changes in the settings of one factor (such as feed rate) will automatically cause or demand changes in other parts of the system (such as flotation rate, particle size recovery, air flow, pulp density, etc.) As a result, it is difficult to

Get Price

Mining Wikipedia

Mining is the extraction of valuable minerals or other geological materials from the Earth, usually from an ore body, lode, vein, seam, reef or placer deposits form a mineralized package that is of economic interest to the miner. Ores recovered by mining include metals, coal, oil shale, gemstones, limestone, chalk, dimension stone, rock salt, potash, gravel, and clay.

Get Price

Recovery Factor Prediction for Deepwater Gulf of Mexico ...

Recovery factor is affected by many geological and engineering factors; as a result, there is no explicit approach to accurately calculate the recovery factor. This is particularly true for deepwater development as the parameters associated with the recovery factor estimation have significant uncertainties and usually extremely costly to obtain.

Get Price

Mining Recovery Factor

A mining recovery of 92% is assumed for longhole open stoping Mining. The mining recovery factor is depended on rock mechanics recommendations. Get Price And Support Online; Production forecasting analog methods PetroWiki. If the analog method is to be …

Get Price

INTRODUCTION TO MINING

Mining technology,like that of all industry,languished during the Dark Ages. Notably,a political development in 1185 improved the standing of mining and the status of miners,when the bishop of Trent granted a charter to miners in his domain. It gave miners legal as well as social rights,including

Get Price

JPT Technique Blends Dimensionless Numbers and Data Mining ...

Subsequently, partialleastsquare (PLS) regression is used to relate the dimensionless numbers to the recovery factor. This study shows that dimensionless numbers, together with datamining techniques, can predict field behavior in terms of recovery factor for sparse data sets. Introduction

Get Price

Increasing Hydrocarbon Recovery Factors

Increasing Hydrocarbon Recovery Factors P. Zitha, R. Felder, D. Zornes, K. Brown, and K. Mohanty Introduction. Conventional and unconventional hydrocarbons are likely to remain the main component of the energy mix needed to meet the growing global energy demand in the next 50 years.

Get Price

GEOVIA Whittle is now available | Discover, Model ...

Jul 08, 2017· When the Mining recovery or Dilution does not equal to 1, the Simultaneous Optimization process now reports the correct amount of metal and grade. The summary tabs for the Simultaneous Optimization node and the SIMO Report node now match. Workflow improvements make the use of Simultaneous Optimization more user friendly:

Get Price

INTRODUCTION TO MINING

mining in systematic openings 2 to 3 ft ( to m) in height and more than 30 ft (9m) in depth (Stoces,1954). However,the oldest known underground mine,a hematite mine at Bomvu Ridge,Swaziland(Gregory,1980),is from the Old Stone Age and believed to …

Get Price

Open Pit Optimisation and Design: A Stepwise Approach*

Open Pit Optimisation and Design: A Stepwise Approach* E. J. A. Appianing and D. MirekuGyimah Appianing, E. J. ... factors considered include milling and mining recovery factors, cost figures, overall pit slopes, ... Mining dilution 5 % Revenue factor range to 2 at steps

Get Price

Ore Dilution Recovery in Mining

Recovery and dilution usually are interrelated; with some methods of stoping a high recovery involves contamination of the ore from the walls or capping, and often clean ore can be obtained only by leaving some ore in the mine. In openstope mines the greatest loss of ore is that tied up in pillars left for support of the back or hanging wall.

Get Price

Gold Fields Mineral Resources and Mineral Reserves ...

The current mining areas at Waroonga include highgrade ore from Kim South and FBH, supplemented with runofmine (RoM) grade ore from Main North and South. At New Holland, mining in the Cinderella and Sheba areas has been the main focus. Remnant mining from New Holland has also contributed to the recent gold production.

Get Price

The mine planning process for an openpit diamond mining ...

Mining recovery, mining dilution, and processing recovery. At this stage only the diamond prices and operating costs for the current year are applied. Whittle mines the pit as if the mining occurs in a single year, hence neither the discount factor, capital, nor the mining and processing schedules are applied at …

Get Price

Comparing Venezuelan and Canadian Heavy Oil and Tar Sands

recovery factor current rates 10% of Heavy OOIP 27 years 30% of Heavy OOIP 81 years 50% of Heavy OOIP 135 years 1 This figure, published in Kopper et al, 2001, is approximately half the figure of over two trillion barrels that the Venezuelan government was using a decade ago.

Get Price

THE IMPORTANCE OF DILUTION FACTOR FOR OPEN PIT …

grade means lower mill recovery. Dilution also increases the cutoff grade which in turn reduces the overall ore utilization of a mine. In some cases, to take advantage of economies of scale, mining operations tend to plan for higher mining rates. Moving to a larger scale of operation means less selectivity, hence more dilution.

Get Price

PHASES OF A MINING PROJECT ELAW

PHASES OF A MINING PROJECT There are different phases of a mining project, beginning with mineral ore exploration and ending with the postclosure period. What follows are the typical phases of a proposed mining project. Each phase of mining is associated with different sets of environmental impacts. Exploration

Get Price

Insitu: Oil Sands Mining Goes Underground

Sep 01, 2010· While CSS is still utilized and viable — Cold Lake retains its status as the largest in situ project at 150,000 bopd — the oil industry was not satisfied with a 25 percent recovery factor and ...

Get Price

Dilution and ore recovery QueensMineDesignWiki

Recovery factor during the primary recovery stage is typically 515%. While the underground pressure in the oil reservoir is sufficient to force the oil to the surface, all that is necessary is to place a complex arrangement of valves (the Christmas tree) on the well head to connect the well to a pipeline network for storage and processing.

Get Price

THUNDERBIRD ORE RESERVE UPDATE Sheffield Resources

generated for the Ore Reserve estimate. A 98% mining recovery factor was applied to ore material, no additional dilution factor has been applied given the bulk nature of the proposed mining operations and the removal of overburden and mineralised waste well in advance of ore mining. Minimum mining width

Get Price

Capital Recovery Factor

Example: For i = 7% and N = 5 years, the capital recovery factor is equal to A 1000 loan at 7% interest could therefore be paid back with five annual payments of The present value of the five annual payments of is 1000.. See also. Sinking Fund Factor

Get Price

Wheeler River Project | Denison Mines Corp.

A mining recovery factor of 85% has been applied to the mineral resource above the cutoff grade; Mineral reserves for the Gryphon deposit are estimated at a cutoff grade of % U 3 O 8 using a longterm uranium price of USD40/lb, and a USD/CAD exchange rate of

Get Price

2012 Americas School of Mines PwC

complexity of the metal recovery factor. • Recognizing ore loaded on heap leach pads as inventory is normal PwC mining industry practice (matching principle). • Consider each pad …

Get Price

Major Mines Projects | New Luika Mine

A mining recovery factor of was applied to both cutandfill and longhole openstope production, with the exception of the final retreat under cutandfill sill pillars where a mining recovery factor of was applied. Minimum mining widths of 6 m for cutandfill and 3 m for longhole openstopes were used.

Get Price